Jig design for reduction of assembly cycle time and defect for front panel assembly /
Problems that often occur when the assembly process is high assemcly time and defect are serious problem that occurs in every production industry.To complete the assembly process of front panel at Wong Engineering thesame problem happen which is the cycle time too long and defect frequently happens...
Zapisane w:
1. autor: | |
---|---|
Korporacja: | |
Format: | Praca dyplomowa Oprogramowanie E-book |
Język: | English |
Wydane: |
Perlis, Malaysia
School of Manufacturing Engineering, University Malaysia Perlis
2016
|
Hasła przedmiotowe: | |
Etykiety: |
Dodaj etykietę
Nie ma etykietki, Dołącz pierwszą etykiete!
|
Napisz pierwszy komentarz!