The study of industrialised building system, the implementation barriers of pm2 advance building system : a case study in Perlis /
The study is about the Industrialised Building System (IBS), The Implementation Barriers of PM2 Advance Building System. The study is made to determine the hindrance occurred using the IBS technique of PM2 panel. The objectives of the research are to study the level of awareness of usage of PM2 pane...
Saved in:
Main Author: | Ahmad Mikail Ahmad Nadzri |
---|---|
Corporate Author: | Universiti Malaysia Perlis |
Format: | Thesis Book |
Language: | English |
Published: |
Perlis, Malaysia :
School of Environmental Engineering, University Malaysia Perlis,
2016
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Effectiveness Of Industrialised Building System (IBS) By Using Expanded Polystyrene (EPS) - A Case Study Of Project Finance Initiative 2 (PFI2) Student Hostels For 4000 Students At Pauh Putra Main Campus Universiti Malaysia Perlis (UniMAP) /
by: Siti Nursyahira Khairil Anuar
Published: (2016) -
Influence of Meteorological Factors on Varations of Particulate Matter (PM10) Concentration During Haze Episodes in Malaysia. /
by: Nur Izzah Mohamad Hashim
Published: (2017) -
Influence of Meteorological Factors on Varations of Particulate Matter (PM10) Concentration During Haze Episodes in Malaysia. /
by: Nur Izzah Mohamad Hashim
Published: (2017) -
Stability Of High Rise Building/
by: Tan Mei Chen
Published: (2016) -
A case study : survey on road safety in jalan hospital, Kangar, Perlis /
by: Nur Syazwana Amira Malihan
Published: (2016)