Comparison of tende r evaluation of practice general rules against cut off for government projects /
The tender evaluation process for government project are using conventional method or general rules before the cut off method have been announced and implemented by Public Works Department (JKR) Malaysia in 2004. The implementation of this new statistic method was a great action in resulting the fai...
Saved in:
Main Author: | Ahmad Safwan Mohamed Yusoff |
---|---|
Corporate Author: | Universiti Malaysia Perlis |
Format: | Thesis Book |
Language: | English |
Published: |
Perlis, Malaysia :
School of Environmental Engineering, University Malaysia Perlis,
2016
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Tending roses
by: Wingate, Lisa
Published: (2001) -
Tending roses
by: Wingate, Lisa
Published: (2001) -
Evaluation of Precast Beam To Column Connection Using Finite Element Method /
by: Nurul Afiq Abdul Halim
Published: (2016) -
Study Of A Geotechnical Evaluation Of Termite Mound Clay As A Potential Replacement Of Bentonite In Developing Low Permeability Soil Mix /
by: Nur Aishah Mohammad Zanwa
Published: (2016) -
Characterization and Properties of PP/NBR/EFB Composites with PPMAH CompatibiLizer/
by: Khalid Mohamed Abdillahi
Published: (2016)