Characterization Of Rainwater From Rainwater Harvesting In Relation To Its Usage For Human Consumption /
For this project, the objectives are to study on the physicochemical parameters of collected rainwater from asbestos roof within 5, 10, 15, 20, and 25 minutes of the start of rainfall. To determine the appropriate 'first-flush' period (a duration from the start of rainfall to the point whe...
Saved in:
Main Author: | |
---|---|
Corporate Author: | |
Format: | Thesis Book |
Language: | English |
Published: |
1 Perlis,Malaysia
School of Environmental Engineering, Universiti Malaysia Perlis
2015
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Summary: | For this project, the objectives are to study on the physicochemical parameters of collected rainwater from asbestos roof within 5, 10, 15, 20, and 25 minutes of the start of rainfall. To determine the appropriate 'first-flush' period (a duration from the start of rainfall to the point where the contaminants in the collected rainwater has reach acceptable level), for an asbestos roof. |
---|---|
Physical Description: | 1 CD-ROM 12 cm |
Bibliography: | Includes bibliographical references |