Cycle time variation analysis on shop floor production line-a case study in medical device manufacturing industry/
This is a case study of cycle time of machines and production lines of a medical device manufacturing plant. Unstable cycle times leads to unreliable production operation which in turn reduces producticity. More time, energy and money is wasted in non-value added activities. Therefore this research...
Shranjeno v:
Glavni avtor: | |
---|---|
Korporativna značnica: | |
Format: | Thesis Software eKnjiga |
Jezik: | English |
Izdano: |
Perlis, Malaysia
School of Manufacturing Engineering, University Malaysia Perlis
2016
|
Teme: | |
Oznake: |
Označite
Brez oznak, prvi označite!
|
Komentirajte kot prvi!