System to reduce and optimize inventory at engineering room /
Nowadays, most companies and facteries do not realize that the management made a waste of money, time and cost of such inventorie, transportation, over-processing, over-production waiting tine and motion products. So with the situation prevailing in the company or the factory, they have to try to f...
Sábháilte in:
Príomhchruthaitheoir: | Ainul Ameera Binti Che Ani |
---|---|
Formáid: | Tráchtas LEABHAR |
Teanga: | English |
Foilsithe / Cruthaithe: |
Perlis, Malaysia
School of Manufacturing Engineering, University Malaysia Perlis
2016
|
Ábhair: | |
Rochtain ar líne: | Click here to view the full text content |
Clibeanna: |
Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|
Míreanna comhchosúla
-
The improvement on inventory system using lean-six sigma approaches /
de réir: Nur Zafirah Mohd Ar Fahiman
Foilsithe / Cruthaithe: (2016) -
Reducing cycle time in semiconductor manufacturing process/
de réir: Lim, Yee Chew
Foilsithe / Cruthaithe: (2010) -
Thermal comfort study in BPU7 lecture room /
de réir: Muhamad Amir Syukri Mohamed
Foilsithe / Cruthaithe: (2016) -
Thermal comfort study in BPU7 lecture room /
de réir: Muhamad Amir Syukri Mohamed
Foilsithe / Cruthaithe: (2016) -
Optimization of Fenton Oxidation to Treat Textile Wastewater/
de réir: Siti Nurshamila Binti Zamzury
Foilsithe / Cruthaithe: (2016)