A case study on the improvement of production line at the automotive industry /

This project is on "a case study on the improvement of production line for side member at automotive industry". Traditionally operated industrial industries are facing problems like low productivity, longer production lead time, high rework and rejection, poor line balancing, low flexibili...

全面介绍

Saved in:
书目详细资料
主要作者: Mohammad Afiqzuddin Bin Mohd Azan
格式: Thesis 图书
语言:English
出版: Perlis, Malaysia School of Manufacturing Engineering, University Malaysia Perlis 2016
主题:
在线阅读:Click here to view the full text content
标签: 添加标签
没有标签, 成为第一个标记此记录!
实物特征
总结:This project is on "a case study on the improvement of production line for side member at automotive industry". Traditionally operated industrial industries are facing problems like low productivity, longer production lead time, high rework and rejection, poor line balancing, low flexibility of style changeover. These problems were addressed in this study by the implementation of Six SIGMA tools like standard manufacturing line, single piece flow, work standardization, just in time production. Some of the key benefits entail production cycle time decreased, number of operators required to produce equal amount of production is decreased, rework level reduced by, production lead time comes down to one hour from two days, work in progress inventory stays at a maximum of 400 pieces per shift.
实物描述:xi, 67 pages illustrations (some color) 30 cm.