A case study on the improvement of production line at the automotive industry /

This project is on "a case study on the improvement of production line for side member at automotive industry". Traditionally operated industrial industries are facing problems like low productivity, longer production lead time, high rework and rejection, poor line balancing, low flexibili...

詳細記述

保存先:
書誌詳細
第一著者: Mohammad Afiqzuddin Bin Mohd Azan
フォーマット: 学位論文 図書
言語:English
出版事項: Perlis, Malaysia School of Manufacturing Engineering, University Malaysia Perlis 2016
主題:
オンライン・アクセス:Click here to view the full text content
タグ: タグ追加
タグなし, このレコードへの初めてのタグを付けませんか!
その他の書誌記述
要約:This project is on "a case study on the improvement of production line for side member at automotive industry". Traditionally operated industrial industries are facing problems like low productivity, longer production lead time, high rework and rejection, poor line balancing, low flexibility of style changeover. These problems were addressed in this study by the implementation of Six SIGMA tools like standard manufacturing line, single piece flow, work standardization, just in time production. Some of the key benefits entail production cycle time decreased, number of operators required to produce equal amount of production is decreased, rework level reduced by, production lead time comes down to one hour from two days, work in progress inventory stays at a maximum of 400 pieces per shift.
物理的記述:xi, 67 pages illustrations (some color) 30 cm.