A case study on the improvement of production line at the automotive industry /

This project is on "a case study on the improvement of production line for side member at automotive industry". Traditionally operated industrial industries are facing problems like low productivity, longer production lead time, high rework and rejection, poor line balancing, low flexibili...

ver descrição completa

Na minha lista:
Detalhes bibliográficos
Autor principal: Mohammad Afiqzuddin Bin Mohd Azan
Formato: Thesis Livro
Idioma:English
Publicado em: Perlis, Malaysia School of Manufacturing Engineering, University Malaysia Perlis 2016
Assuntos:
Acesso em linha:Click here to view the full text content
Tags: Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
LEADER 02162nam a2200337 i 4500
001 vtls000127758
003 MY-ArUMP
005 20220329102121.0
008 161219s2016 my a f b 100 u eng d
035 |a (OCoLC)966419330 
035 |a (OCoLC)ocn966419330 
039 9 |a 201701020904  |b RAR  |y 201612191053  |z RAR 
040 |a MYPMP  |b eng  |e rda  |c MYPMP 
049 |a MYPA 
090 0 0 |a TA158  |b P4A257 2016  |c f  |d rb 
100 0 |a Mohammad Afiqzuddin Bin Mohd Azan 
245 1 0 |a A case study on the improvement of production line at the automotive industry /  |c Mohammad Afiqzuddin Bin Mohd Azan 
264 1 |a Perlis, Malaysia  |b School of Manufacturing Engineering, University Malaysia Perlis  |c 2016 
300 |a xi, 67 pages  |b illustrations (some color)  |c 30 cm. 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
502 |a Final Year Project (Degree) - - University Malaysia Perlis, 2016 
520 |a This project is on "a case study on the improvement of production line for side member at automotive industry". Traditionally operated industrial industries are facing problems like low productivity, longer production lead time, high rework and rejection, poor line balancing, low flexibility of style changeover. These problems were addressed in this study by the implementation of Six SIGMA tools like standard manufacturing line, single piece flow, work standardization, just in time production. Some of the key benefits entail production cycle time decreased, number of operators required to produce equal amount of production is decreased, rework level reduced by, production lead time comes down to one hour from two days, work in progress inventory stays at a maximum of 400 pieces per shift. 
650 0 |a Industrial engineering. 
856 |u http://dspace.unimap.edu.my/xmlui/handle/123456789/69816  |y Click here to view the full text content 
942 |2 lcc  |c FYP 
949 |6 052651 
994 |a C0  |b MYPMP 
999 |c 19529  |d 19529 
952 |0 0  |1 0  |2 lcc  |4 0  |6 TA0158 P4 A257 02016 F RB  |7 0  |9 24866  |a PTSFP  |b PTSFP  |c 6  |d 2021-07-31  |o TA158 P4A257 2016 f rb  |p 052651  |r 2021-07-31  |t 1  |w 2021-07-31  |y FYP