Double sided assemblymline balancing problem by using comsoal : an automotive industry case study /

This project will presents optimum efficiency improvement of assembly production line by applying line balancing technique in industry chosen. In order to obtain sustainability of optimum production, company must manage the production line very well. In this case, a systematic technique or approach...

Full description

Saved in:
Bibliographic Details
Main Author: Aishatul Fadhilah Binti Ramzi
Format: Thesis Book
Language:English
Published: Perlis, Malaysia School of Manufacturing Engineering, University Malaysia Perlis 2016
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 02149nam a2200349 i 4500
001 vtls000135001
003 MY-ArUMP
005 20210731032559.0
008 170524s2016 my a f b 100 u eng d
035 |a (OCoLC)987465608 
035 |a (OCoLC)ocn987465608 
039 9 |a 201705241537  |b RAR  |y 201705241451  |z RAR 
040 |a MYPMP  |b eng  |e rda  |c MYPMP 
049 |a MYPA 
090 0 0 |a TA158  |b P4A299 2016  |c f  |d rb 
100 1 |a Aishatul Fadhilah Binti Ramzi 
245 1 0 |a Double sided assemblymline balancing problem by using comsoal :  |b an automotive industry case study /  |c Aishatul Fadhilah Binti Ramzi 
264 1 |a Perlis, Malaysia  |b School of Manufacturing Engineering, University Malaysia Perlis  |c 2016 
300 |a xiv, 101 pages  |b illustrations  |c 30cm 
336 |a text  |b txt  |2 rdacontent 
337 |a unmediated  |b n  |2 rdamedia 
338 |a volume  |b nc  |2 rdacarrier 
347 |a text file  |b PDF  |2 rda 
502 |a Final Year Project (Degree) - - Universiti Malaysia Perlis, 2016 
504 |a Includes bibliographical references 
520 |a This project will presents optimum efficiency improvement of assembly production line by applying line balancing technique in industry chosen. In order to obtain sustainability of optimum production, company must manage the production line very well. In this case, a systematic technique or approach should be introduced. One of the technique is line balancing technique. The used of line balancing technique was proved able to increase the productivity of the company. Several improvements steps will be suggessted throughout the project to current system such as rearranging the arrangement of the part eliminating unnecessary activities of the assembly process, reducing the cycle time and balancing manpower workload. This project is done at Motosikal dan Enjin Nasional (MODENAS). 
650 0 |a Manufacturing engineering 
942 |2 lcc  |c FYP 
949 |a VIRTUAITEM  |d 30000  |f 1  |x 902  |6 053779 
994 |a C0  |b MYPMP 
999 |c 19629  |d 19629 
952 |0 0  |1 0  |2 lcc  |4 0  |6 TA0158 P4 A299 02016 F RB  |7 0  |9 24970  |a PTSFP  |b PTSFP  |c 6  |d 2021-07-31  |o TA158 P4A299 2016 f rb  |p 053779  |r 2021-07-31  |t 1  |w 2021-07-31  |y FYP