The improvement on inventory system using lean-six sigma approaches /
The inventory system is a quantity of goods product and was storing in werehouse by a business that is intended either for resale or as a raw materials and components used in producing goods that the business sells. This study was conducted in order to improve the layout of inventory in finishing pr...
Saved in:
| Main Author: | |
|---|---|
| Format: | Thesis Book |
| Language: | English |
| Published: |
Perlis, Malaysia
School of Manufacturing Engineering, University Malaysia Perlis
2016
|
| Subjects: | |
| Online Access: | Click here to view the full text content |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 02357nam a2200361 i 4500 | ||
|---|---|---|---|
| 001 | vtls000135005 | ||
| 003 | MY-ArUMP | ||
| 005 | 20220325092046.0 | ||
| 008 | 170524s2016 my a f b 100 u eng d | ||
| 035 | |a (OCoLC)987465612 | ||
| 035 | |a (OCoLC)ocn987465612 | ||
| 039 | 9 | |a 201705310908 |b RAR |y 201705241451 |z RAR | |
| 040 | |a MYPMP |b eng |e rda |c MYPMP | ||
| 049 | |a MYPA | ||
| 090 | 0 | 0 | |a TA158 |b P4N974 2016 |c f |d rb |
| 100 | 0 | |a Nur Zafirah Binti Mohd Ar Fahiman | |
| 245 | 1 | 0 | |a The improvement on inventory system using lean-six sigma approaches / |c Nur Zafirah Binti Mohd Ar Fahiman |
| 264 | 1 | |a Perlis, Malaysia |b School of Manufacturing Engineering, University Malaysia Perlis |c 2016 | |
| 300 | |a xi, 72 pages |b illustrations |c 30cm | ||
| 336 | |a text |b txt |2 rdacontent | ||
| 337 | |a unmediated |b n |2 rdamedia | ||
| 338 | |a volume |b nc |2 rdacarrier | ||
| 347 | |a text file |b PDF |2 rda | ||
| 502 | |a Final Year Project (Degree) - - Universiti Malaysia Perlis, 2016 | ||
| 504 | |a Includes bibliographical references | ||
| 520 | |a The inventory system is a quantity of goods product and was storing in werehouse by a business that is intended either for resale or as a raw materials and components used in producing goods that the business sells. This study was conducted in order to improve the layout of inventory in finishing product by using Lean-Six Sigma approaches. This study was focusing in the werehouse of finishing product because the management in the inventory is bad. Due the this problem, customer order need hold to around two days. Based on the observation, several potential causes and problem was identified which can cause the customer waiting. To improve this problem, the DMAIC, Cause and Effect diagram, Five Why Method and Lean Manufacturing tool was using. The propose improvement was focused on the customer demand per two weeks and the layout of an inventory in the werehouse to ensure the customer's order can get on the right time. | ||
| 650 | 0 | |a Manufacturing engineering | |
| 856 | |u http://dspace.unimap.edu.my/xmlui/handle/123456789/70040 |y Click here to view the full text content | ||
| 942 | |2 lcc |c FYP | ||
| 949 | |6 053788 | ||
| 994 | |a C0 |b MYPMP | ||
| 999 | |c 19633 |d 19633 | ||
| 952 | |0 0 |1 0 |2 lcc |4 0 |6 TA0158 P4 N974 02016 F RB |7 0 |9 24974 |a PTSFP |b PTSFP |d 2021-07-31 |l 0 |o TA158 P4N974 2016 f rb |p 053788 |r 2021-07-31 |t 1 |w 2021-07-31 |y FYP | ||