Application of program evaluation and review technique (PERT) and linear programming (LP) in project management /

This study seeks to control the management of a project and optimizing the cost by using Program Evaluation and Review Technique (PERT) and Linear Programming (LP). Data used is taken from a large-scale construction projects a new building consists of two floors which are Administration Office and M...

Ausführliche Beschreibung

Gespeichert in:
Bibliographische Detailangaben
1. Verfasser: Siti Fairuz A. Rahim (VerfasserIn)
Körperschaft: Universiti Malaysia Perlis
Format: Abschlussarbeit Buch
Sprache:English
Veröffentlicht: Perlis, Malaysia Institute of Engineering Mathematics 2015
Schlagworte:
Tags: Tag hinzufügen
Keine Tags, Fügen Sie den ersten Tag hinzu!
Beschreibung
Zusammenfassung:This study seeks to control the management of a project and optimizing the cost by using Program Evaluation and Review Technique (PERT) and Linear Programming (LP). Data used is taken from a large-scale construction projects a new building consists of two floors which are Administration Office and Medan Selera for the new residential student's college project at the Main Campus of University Malaysia Perlis (UniMAP), Mukim Padang Siding, Pauh, Perlis.
Beschreibung:xi, 89 pages colour illustrations 30 cm.
Bibliographie:Includes bibliographical references.