Application of program evaluation and review technique (PERT) and linear programming (LP) in project management /
This study seeks to control the management of a project and optimizing the cost by using Program Evaluation and Review Technique (PERT) and Linear Programming (LP). Data used is taken from a large-scale construction projects a new building consists of two floors which are Administration Office and M...
Sábháilte in:
| Príomhchruthaitheoir: | |
|---|---|
| Údar corparáideach: | |
| Formáid: | Tráchtas Bogearraí Ríomhleabhar |
| Teanga: | English |
| Foilsithe / Cruthaithe: |
Perlis, Malaysia
Institute of Engineering Mathematics
2015
|
| Ábhair: | |
| Clibeanna: |
Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|
| Achoimre: | This study seeks to control the management of a project and optimizing the cost by using Program Evaluation and Review Technique (PERT) and Linear Programming (LP). Data used is taken from a large-scale construction projects a new building consists of two floors which are Administration Office and Medan Selera for the new residential student's college project at the Main Campus of University Malaysia Perlis (UniMAP), Mukim Padang Siding, Pauh, Perlis. |
|---|---|
| Cur síos fisiciúil: | 1 CD-ROM 12 cm |
| Leabharliosta: | Includes bibliographical references. |