Production boundary limits in commercial processing of misai kucing /
This final year project (FYP) aims to the study consisted of literature review, field trial, laboratory study and simulation model. This is important to determine the production capacity utilization and equipment uptime of supply chain from field planting until final product processing. In the liter...
Saved in:
Hovedforfatter: | |
---|---|
Format: | Thesis Software eBog |
Sprog: | English |
Udgivet: |
Kangar, Perlis
School of Bioprocess Engineering, University Malaysia Perlis
2011
|
Fag: | |
Tags: |
Tilføj Tag
Ingen Tags, Vær først til at tagge denne postø!
|
System Under Maintenance
Our Library Management System is currently under maintenance.
Holdings and item availability information is currently unavailable. Please accept our apologies for any inconvenience this may cause and contact us for further assistance: