Production boundary limits in commercial processing of misai kucing /
This final year project (FYP) aims to the study consisted of literature review, field trial, laboratory study and simulation model. This is important to determine the production capacity utilization and equipment uptime of supply chain from field planting until final product processing. In the liter...
Sábháilte in:
Príomhchruthaitheoir: | |
---|---|
Formáid: | Tráchtas Bogearraí Ríomhleabhar |
Teanga: | English |
Foilsithe / Cruthaithe: |
Kangar, Perlis
School of Bioprocess Engineering, University Malaysia Perlis
2011
|
Ábhair: | |
Clibeanna: |
Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|
Cothabháil á déanamh ar an gcóras
Níl fáil ar ár mbunachar sonraí beo faoi láthair.
Labhair le ball foirne sula gcuirfidh tú iarratas isteach toisc go bhféadfadh sé nach bhfuil an fhaisnéis atá á taispeáint anseo cothrom le dáta.