Safety in IBS contruction : A study on safety during precast concrete installation /
The safety aspect is very important in construction projects. Any construction projects such as the installation of precast concrete will accident if they are not concerned about safety aspect during the process of making the work as helmet, gloves and shoes.The goal of the project aims to find ways...
Saved in:
Main Author: | |
---|---|
Format: | Thesis Book |
Language: | English |
Published: |
Perlis, Malaysia
School of Environmental Engineering, University Malaysia Perlis
2014
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 02089nmm a2200349 i 4500 | ||
---|---|---|---|
001 | vtls000125443 | ||
003 | MY-KaKUK | ||
005 | 20210816100947.0 | ||
008 | 150703s2014 my fq d eng d | ||
035 | |a (OCoLC)ocn913036840 | ||
039 | 9 | |a 201507231130 |b SMI |c 201507031553 |d SMI |c 201507031552 |d SMI |y 201507031536 |z SMI | |
040 | |a MYPMP |b eng |e rda |c MYPMP |d MYPMP | ||
049 | |a MYPA | ||
090 | 0 | 0 | |a TD173 |b A4Q1 2014 |c rb |
100 | 1 | |a Muhammad Qayyim Bin Suhaimi |e author | |
245 | 1 | 0 | |a Safety in IBS contruction : |b A study on safety during precast concrete installation / |c Muhammad Qayyim Bin Suhaimi |
264 | 1 | |a Perlis, Malaysia |b School of Environmental Engineering, University Malaysia Perlis |c 2014 | |
300 | |a 1 CD-ROM |c 12 cm | ||
336 | |a text |b txt |2 rdacontent | ||
337 | |a computer |b c |2 rdamedia | ||
338 | |a computer disc |b cd |2 rdacarrier | ||
347 | |a text file |b PDF |2 rda | ||
502 | |a Final Year Project (Degree) - - Universiti Malaysia Perlis, 2014 | ||
504 | |a Includes bibliographical references (pages 44-45) | ||
520 | |a The safety aspect is very important in construction projects. Any construction projects such as the installation of precast concrete will accident if they are not concerned about safety aspect during the process of making the work as helmet, gloves and shoes.The goal of the project aims to find ways to avoid hazards and accidents to employees at the workplace, to identify the machines and equipment installed / used safely for workers and environmental conditions as well as provides recommendations for employees to follow instructions and installation of precast concrete in a way that correct. | ||
541 | |c Gift; |a Bachelor of Engineering (Civil Engineering), School of Environmental Engineering; |b 2015 | ||
650 | 0 | |a Environmental | |
949 | |a VIRTUAITEM |d 30000 |f 1 |x 701 |6 902001380 |a TD173 A4Q1 2014 rb | ||
942 | |2 lcc |c COMPFILE | ||
994 | |a C0 |b MYPMP | ||
999 | |c 97801 |d 97801 | ||
952 | |0 0 |1 0 |2 lcc |4 0 |6 TD0173 A4 Q1 02014 RB |7 0 |9 96754 |a PTSFP |b PTSFP |c 8 |d 2021-08-16 |l 0 |o TD173 A4Q1 2014 rb |p 902001380 |r 2021-08-16 |t 1 |w 2021-08-16 |y COMPFILE |