The structure defects and finishing of school building in Perlis /
The aim of this study is to investigate the types of structure defects and finishing of school building, to analyze the factors that contributed to the school building defects and the last one is to evaluate the level of satisfaction level for the repair work of defects performed by contractor.
Saved in:
Main Author: | Nur Inani Yunus (Author) |
---|---|
Format: | Thesis Software eBook |
Language: | English |
Published: |
Perlis, Malaysia
School of Environmental Engineering, University Malaysia Perlis
2013
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Investigation of the building defects at Kuala Perlis flats /
by: Syahrul Azizi Kamaruzaman
Published: (2013) -
Study on application of industrialized building system (IBS) in Perlis /
by: Luqman Walid
Published: (2012) -
Flood study in Kangar, Perlis /
by: Muhammad Hafiz Abdul Rahim
Published: (2012) -
Effect of human activity on water quality of Perlis River /
by: Nur Aqilah Sapiee
Published: (2010) -
Energy potential form municipal solis waste in Perlis /
by: Nur Wahidah Mardhiah Zullkiplee
Published: (2011)