Implementation of overall equipment effectiveness in surface mounting technology /

The purpose of this paper is to study on implementing Overall Equipment Effectiveness (OEE) in Surface Mounting Technology (SMT) for Flexible Circuit Board Assembly Industry. OEE comprises of Availability, Performance and Quality which able to identify six major losses in the manufacturing which con...

Celý popis

Uloženo v:
Podrobná bibliografie
Hlavní autor: Davandran V. Nanjan (Autor)
Médium: Program E-kniha
Jazyk:English
Vydáno: 2019.
Témata:
Tagy: Přidat tag
Žádné tagy, Buďte první, kdo otaguje tento záznam!
LEADER 03935pam a2200457 i 4500
001 117853
003 UTeM
005 20210111115641.0
007 co ag ||||||||
008 201014s2019 my ||||| |||| 00| | eng d
999 |c 117853  |d 117853 
020 |c gift 
040 |a UTeM  |b eng  |c UTeM  |e rda 
090 0 0 |a TS192  |b .D38 2019 
100 0 |a Davandran V. Nanjan,  |e author.  |9 167287 
245 1 0 |a Implementation of overall equipment effectiveness in surface mounting technology /  |c Davandran V. Nanjan. 
264 1 |c 2019. 
300 |a x, 98 pages :  |b colour illustrations, charts, photographs ;  |c 30 cm +  |e 1 computer disc (12 cm) 
336 |a text  |2 rdacontent 
336 |a still image  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
347 |a text file  |b WORD  |c 7.39 MB  |2 rda 
500 |a Accompanied by CD : CDR 20958. 
504 |a Reference : pages 92-98. 
506 |a Restricted until 5 August 2023.  
520 |a The purpose of this paper is to study on implementing Overall Equipment Effectiveness (OEE) in Surface Mounting Technology (SMT) for Flexible Circuit Board Assembly Industry. OEE comprises of Availability, Performance and Quality which able to identify six major losses in the manufacturing which consist of machine breakdown, set up and adjustment, minor stoppages, reduce speed, starl-up rejection and production reject However, this study focused on reduced speed loss whereas printing speed is not as accordance mentioned in solder paste technical data sheet, The solder paste and machine capable to print with 100mm/s but actual setting is slower which was a loss that was identified. Therefore, printing speed been standardised and the consequence from it being analysed and improved. Prior to this, the weaknesses identified on Availability, Performance and Quality which decreasts the OEE ratio. Hence, PDCA methodology being adapted in this study as a proper plan to identify the root causes and implementation of improvement action to enhance OEE ratio. The PDCA implementation have been supported by tools such as brainstorming, Ishikawa diagram, Five Why’s technique and Kaizen. As consequence, two improvement activities introduced which are pallet cooling system and laser cut stainless steel stencil with Nano-coating. Pallet coolingsystem implemented to overcome the machine idling due to waiting pallet to cool down. Hence, this implementation reduced pallet cooling time from the current stage of approximately 300 seconds to below 120 seconds. The next improvement action was laser cut stencil with Nano-coating implemented to improve paste transfer efficiency. Hence, paste volume was measured and data shows stencil with coating achieved better volume on the soldering pad which was 153.86% compare to stencil without coating which are at 108.24%. Thercfore, it improved the quality yield by reducing open joint solder short defeets. The result of this study shows by adapting these tools, Availability achieved target set of 85% while Performance improved to consistently above 70% and Quality ratio above 98%. As a result, OEE shows improvement which consistently achieved above 60%.  
650 0 |a Industrial efficiency  |9 4162 
650 0 |a Surface mount technology  |9 4163 
710 2 |a Universiti Teknikal Malaysia Melaka,  |e issuing body.  |9 558 
720 |a Associate Professor Dr. Mohd Rizal Salleh 
790 |a Faculty of Manufacturing Engineering  
791 |a Master of Science in Manufacturing Engineering 
792 |a 2019 
942 |2 lcc  |c THM - A  |k a 
996 |a MMFA 
997 |a FKP 
998 0 0 |a msr/141020 
998 0 0 |a mhz/070121 
952 |0 0  |1 0  |2 lcc  |4 0  |6 TS0192 D38 02019  |7 0  |9 147292  |a PLHKI  |b PLHKI  |c 1  |d 2020-10-14  |e UTeM  |o TS192 .D38 2019  |p 87507920  |r 2020-10-14  |w 2020-10-14  |y THM - A 
952 |0 0  |1 0  |2 lcc  |4 0  |6 CDR20958  |7 0  |9 147293  |a MEDIA  |b MEDIA  |c 5  |d 2020-10-14  |e UTeM  |o CDR 20958  |p 87507921  |r 2020-10-14  |w 2020-10-14  |y CDR - MEA