Construction scheduling with Primavera Project planner
Enregistré dans:
Auteur principal: | Feigenbaum, Leslie |
---|---|
Format: | Livre |
Publié: |
Upper Saddle River,NJ
Prentice Hall
2002
|
Édition: | 2nd ed |
Sujets: | |
Tags: |
Ajouter un tag
Pas de tags, Soyez le premier à ajouter un tag!
|
Documents similaires
-
Construction scheduling with Primavera Project planner
par: Feigenbaum, Leslie
Publié: (2002) -
Construction scheduling with Primavera Project planner /
par: Feigenbaum, Leslie
Publié: (2002) -
Construction scheduling with Primavera Project Planner /
par: Feigenbaum, Leslie
Publié: (1998) -
Construction planning and scheduling
par: Hinze, Jimmie W.
Publié: (2008) -
Construction planning and scheduling
par: Hinze, Jimmie W.
Publié: (2008)