A study on botteleneck operations to optimize manpower planning for productivity improvement at 2HC door lining assembly line via MODAPTS /
Saved in:
Main Author: | |
---|---|
Format: | Software eBook |
Language: | English |
Published: |
2013.
|
Subjects: | |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
LEADER | 01519pam a2200373 i 4500 | ||
---|---|---|---|
001 | 84893 | ||
003 | UTeM | ||
005 | 20200403172830.0 | ||
007 | co ag |||||||| | ||
008 | 131206s2013 my ||||| |||| 00| | eng d | ||
999 | |c 84893 |d 84893 | ||
020 | |c gift | ||
040 | |a UTeM |b eng |c UTeM |e rda | ||
090 | 0 | 0 | |a TS176 |b .N35 2013 |
100 | 0 | |a Nur Amira Zulkarnain, |e author. |9 164730 | |
245 | 1 | 2 | |a A study on botteleneck operations to optimize manpower planning for productivity improvement at 2HC door lining assembly line via MODAPTS / |c Nur Amira Zulkarnain. |
264 | 1 | |c 2013. | |
300 | |a xiii, 67 pages : |b colour illustrations ; |c 30 cm + |e 1 computer disc (12 cm) | ||
336 | |a text |2 rdacontent | ||
337 | |a unmediated |2 rdamedia | ||
338 | |a volume |2 rdacarrier | ||
500 | |a Accompanied by CD : CDR 09302. | ||
650 | 0 | |a Production planning. |9 2517 | |
650 | 0 | |a Manufacturing industries. |9 3980 | |
710 | 2 | |a Universiti Teknikal Malaysia Melaka, |e issuing body. |9 558 | |
790 | |a Faculty of Manufacturing Engineering | ||
791 | |a Master of Manufacturing Engineering | ||
792 | |a 2013 | ||
942 | |2 lcc |c THM - A |k a | ||
997 | |a FKP | ||
998 | 0 | 0 | |a nmn/290114 |
998 | 0 | 0 | |a rh/030420 |
952 | |0 0 |1 0 |2 lcc |4 0 |6 TS0176 N35 02013 |7 0 |9 111873 |a PLHKI |b PLHKI |c 1 |d 2019-02-26 |e UTEM |g 0.00 |l 0 |o TS176 .N35 2013 |p 0000106721 |r 2016-02-15 |s 2016-02-15 |w 2019-02-26 |y THM - A | ||
952 | |0 0 |1 0 |2 lcc |4 0 |6 CDR09302 |7 0 |9 112775 |a MEDIA |b MEDIA |c 5 |d 2019-02-26 |g 0.00 |l 0 |o CDR 09302 |p 0000107954 |r 2014-03-24 |s 2014-03-24 |w 2019-02-26 |y CDR - MEA |