Redesign of work process flow for productivity improvement by using systematic layout planning (SLP) /

Saved in:
Bibliographic Details
Main Author: Norfarafazera Mohd Sidek (Author)
Format: Software eBook
Language:English
Published: 2017.
Subjects:
Tags: Add Tag
No Tags, Be the first to tag this record!
LEADER 01676pam a2200421 i 4500
001 106521
003 UTeM
005 20200516093444.0
007 co ag ||||||||
008 180202s2017 my ||||| |||| 00| | eng d
999 |c 106521  |d 106521 
020 |c gift 
040 |a UTeM  |b eng  |c UTeM  |e rda 
090 0 0 |a TS177  |b .N68 2017 
100 0 |a Norfarafazera Mohd Sidek,  |e author.  |9 49271 
245 1 0 |a Redesign of work process flow for productivity improvement by using systematic layout planning (SLP) /  |c Norfarafazera Mohd Sidek. 
264 1 |c 2017. 
300 |a ix, 52 pages :  |b colour illustrations, charts, photographs ;  |c 30 cm +  |e 1 computer disc (12 cm) 
336 |a text  |2 rdacontent 
336 |a still image  |2 rdacontent 
337 |a unmediated  |2 rdamedia 
338 |a volume  |2 rdacarrier 
500 |a Accompanied by CD : CDR 16236. 
504 |a Reference : pages 47-48. 
650 0 |a Factories  |x Location.  |9 35936 
650 0 |a Production planning.  |9 2517 
650 0 |a Plant layout.  |9 26854 
710 2 |a Universiti Teknikal Malaysia Melaka,  |e issuing body.  |9 235 
790 |a Faculty of Manufacturing Engineering 
791 |a Bachelor of Manufacturing Management (Engineering Management) 
792 |a 2017 
942 |2 lcc  |c UGP - A  |k a 
996 |a BMFB 
997 |a FKP 
998 0 0 |a nmt/140218 
998 0 0 |a msr/160520 
952 |0 0  |1 0  |2 lcc  |4 0  |6 TS0177 N68 02017  |7 0  |9 132536  |a PLHKI  |b PLHKI  |c 1  |d 2019-02-26  |e UTEM  |g 0.00  |l 0  |o TS177 .N68 2017  |p 0000132834  |r 2018-04-20  |s 2018-04-20  |w 2019-02-26  |y UGP - A 
952 |0 0  |1 0  |2 lcc  |4 0  |7 0  |9 132737  |a MEDIA  |b MEDIA  |c Media Archives  |d 2019-02-26  |g 0.00  |l 0  |o CDR 16236  |p 0000133077  |r 2018-03-07  |s 2018-03-07  |w 2019-02-26  |y CDR - MEA