Delay analysis in construction contracts /
Guardat en:
| Autor principal: | |
|---|---|
| Altres autors: | |
| Format: | Llibre |
| Idioma: | English |
| Publicat: |
London :
Wiley-Blackwell,
2008.
|
| Matèries: | |
| Etiquetes: |
Afegir etiqueta
Sense etiquetes, Sigues el primer a etiquetar aquest registre!
|
| LEADER | 01260cam a2200313 i 4500 | ||
|---|---|---|---|
| 001 | u75592 | ||
| 003 | SIRSI | ||
| 005 | 20210114120341.0 | ||
| 008 | 110131 eng | ||
| 020 | |a 1405156546 | ||
| 020 | |a 9781405156547 | ||
| 050 | |a HD9715.A2 |b .K42 2008 | ||
| 100 | 1 | |a Keane, P.J.. , |e author |9 185301 | |
| 245 | 1 | 0 | |a Delay analysis in construction contracts / |c P.J.Keane, A.F.Caletka. |
| 264 | 1 | |a London : |b Wiley-Blackwell, |c 2008. | |
| 300 | |a xi, 276 pages : |b illustrations ; |c 25 cm. | ||
| 336 | |a text |b txt |2 rdacontent | ||
| 337 | |a unmediated |b n |2 rdamedia | ||
| 338 | |a volume |b nc |2 rdacarrier | ||
| 596 | |a 1 | ||
| 650 | 0 | |a Construction industry |x Costs. |9 6313 | |
| 650 | 0 | |a Construction industry |x Planning. |9 12852 | |
| 700 | 1 | |a Caletka, A.F. |9 185302 | |
| 942 | |c BOOK_OA | ||
| 997 | |a 142144; 142145 | ||
| 998 | |a 1 |b Shafrizan Shafferi | ||
| 999 | |c 134393 |d 134393 | ||
| 952 | |0 0 |1 0 |2 LCC |4 0 |6 HD9715 A2 K42 02008 |7 0 |9 242255 |a UTHM_LIB |b UTHM_LIB |c OPENACCS |d 2008-09-04 |g 467.06 |l 0 |n 7 |o HD9715.A2 .K42 2008 |p 1000219587 |r 2020-12-05 |t 1 |w 2020-12-05 |y BOOK_OA | ||
| 952 | |0 0 |1 0 |2 LCC |4 0 |6 HD9715 A2 K42 02008 |7 0 |9 242256 |a UTHM_LIB |b UTHM_LIB |c OPENACCS |d 2011-04-15 |g 467.06 |l 0 |n 12 |o HD9715.A2 .K42 2008 |p 1000219588 |r 2020-12-05 |t 2 |w 2020-12-05 |y BOOK_OA | ||