Short term load forecasting with fuzzy logic algorithm
Saved in:
| Main Author: | |
|---|---|
| Corporate Author: | |
| Format: | Book |
| Language: | English |
| Published: |
Durian Tunggal
Universiti Teknikal Malaysia Melaka
2010
|
| Subjects: | |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| LEADER | 01100pam a2200229 4500 | ||
|---|---|---|---|
| 001 | 0000061937 | ||
| 008 | 100818s2010 my eng | ||
| 090 | 0 | 0 | |a TK1005 |b .A32 2010 |
| 100 | 0 | |a Aidil Azhiim Shamsuddin |9 21468 | |
| 245 | 1 | 0 | |a Short term load forecasting with fuzzy logic algorithm |c /Aidil Azhiim Shamsuddin |
| 260 | |a Durian Tunggal |b Universiti Teknikal Malaysia Melaka |c 2010 | ||
| 300 | |a xiv, 100 p. |b ill. (some col.) |c 30 cm | ||
| 500 | |a Projek Sarjana Muda (Bachelor of Electrical Engineering : Industrial Power) - Universiti Teknikal Malaysia Melaka, 2010 | ||
| 500 | |a Accompanied by CD : CDR 04997 | ||
| 650 | 0 | |a Electric power-plants |x Load |x Forecasting |9 18200 | |
| 650 | 0 | |a Electric power consumption |x Forecasting |9 18201 | |
| 650 | 0 | |a Electric utilities |x Planning |9 12736 | |
| 710 | 1 | |a Universiti Teknikal Malaysia Melaka. Faculty of Electrical Engineering |9 6240 | |
| 998 | 0 | 0 | |a nmn/200411 |
| 999 | |c 61719 |d 61719 | ||
| 997 | |a FTK | ||
| 952 | |0 0 |1 0 |2 lcc |4 0 |7 0 |9 86777 |a PLHKI |b PLHKI |c Archives |d 2019-02-26 |e UTEM |g 0.00 |l 2 |o TK1005 A32 2010 |p 0000073564 |r 2011-12-22 |s 2011-12-22 |w 2019-02-26 |y UGP - A | ||