Simulation in reducing customer waiting time in waiting line : a case study at Square One MBO cinema in Batu Pahat /
Uloženo v:
| Hlavní autor: | |
|---|---|
| Médium: | Diplomová práce Kniha |
| Jazyk: | English |
| Vydáno: |
2019.
|
| Témata: | |
| Tagy: |
Přidat tag
Žádné tagy, Buďte první, kdo otaguje tento záznam!
|
| LEADER | 01488cam a2200337 i 4500 | ||
|---|---|---|---|
| 001 | u176363 | ||
| 003 | SIRSI | ||
| 005 | 20210207163640.0 | ||
| 008 | 110131 2019 eng | ||
| 020 | |c gift | ||
| 040 | |a UTHM |b eng |c UTHM |e rda | ||
| 050 | 0 | 0 | |a HF5415.5 |b .S96 2019 ra |
| 100 | 0 | |a Superaman, Sanjev Kumar. , |e author |9 109066 | |
| 245 | 1 | 0 | |a Simulation in reducing customer waiting time in waiting line : |b a case study at Square One MBO cinema in Batu Pahat / |c Sanjev Kumar A/L Superaman |
| 264 | 1 | |c 2019. | |
| 300 | |a xv , 145 pages : |b illustrations (some color) ; |c 30 cm. + |e 1 computer optical disc (4 3/4 in.). | ||
| 336 | |a text |b txt |2 rdacontent | ||
| 337 | |a unmediated |b n |2 rdamedia | ||
| 338 | |a volume |b nc |2 rdacarrier | ||
| 502 | |a Thesis | ||
| 650 | 0 | |a Customer services |9 10630 | |
| 650 | 0 | |a . |9 33674 | |
| 710 | 2 | |a Universiti Tun Hussein Onn Malaysia. |b Fakulti Pengurusan Teknologi dan Perniagaan. |e issuing body. |9 215088 | |
| 790 | |a Fakulti Pengurusan Teknologi dan Perniagaan, Universiti Tun Hussein Onn Malaysia | ||
| 791 | |a B. Eng. | ||
| 792 | |a 2019 | ||
| 942 | |c THESIS_SC |2 lcc | ||
| 998 | |b Shafrizan Shafferi | ||
| 999 | |c 69483 |d 69483 | ||
| 952 | |0 0 |1 0 |2 lcc |4 0 |7 0 |9 120153 |a UTHM_LIB |b UTHM_LIB |c SPECIALCOL |d 2020-01-22 |o HF5415.5 .S96 2019 ra |p 1000350398 |r 2020-12-05 |t 1 |w 2020-12-05 |y THESIS_SC | ||
| 952 | |0 0 |1 0 |2 lcc |4 0 |6 HF54155 S96 02019 RA |7 0 |9 120154 |a UTHM_LIB |b UTHM_LIB |c AV |d 2020-01-22 |o HF5415.5 .S96 2019 ra |p 1000350399 |r 2020-12-05 |t 2 |w 2020-12-05 |y CD_SC | ||