APA (7th ed.) Citation

Azrul Azwan Abdul Rahman. (2013). Approach for integrating predictive-reactive job shop scheduling with PLC-controlled material flow.

Chicago Style (17th ed.) Citation

Azrul Azwan Abdul Rahman. Approach for Integrating Predictive-reactive Job Shop Scheduling with PLC-controlled Material Flow. 2013.

MLA (8th ed.) Citation

Azrul Azwan Abdul Rahman. Approach for Integrating Predictive-reactive Job Shop Scheduling with PLC-controlled Material Flow. 2013.

Warning: These citations may not always be 100% accurate.