System to reduce and optimize inventory at engineering room /
Nowadays, most companies and facteries do not realize that the management made a waste of money, time and cost of such inventorie, transportation, over-processing, over-production waiting tine and motion products. So with the situation prevailing in the company or the factory, they have to try to f...
Gorde:
Egile nagusia: | Ainul Ameera Binti Che Ani |
---|---|
Formatua: | Thesis Liburua |
Hizkuntza: | English |
Argitaratua: |
Perlis, Malaysia
School of Manufacturing Engineering, University Malaysia Perlis
2016
|
Gaiak: | |
Sarrera elektronikoa: | Click here to view the full text content |
Etiketak: |
Etiketa erantsi
Etiketarik gabe, Izan zaitez lehena erregistro honi etiketa jartzen!
|
Antzeko izenburuak
-
The improvement on inventory system using lean-six sigma approaches /
nork: Nur Zafirah Mohd Ar Fahiman
Argitaratua: (2016) -
Reducing cycle time in semiconductor manufacturing process/
nork: Lim, Yee Chew
Argitaratua: (2010) -
Thermal comfort study in BPU7 lecture room /
nork: Muhamad Amir Syukri Mohamed
Argitaratua: (2016) -
Thermal comfort study in BPU7 lecture room /
nork: Muhamad Amir Syukri Mohamed
Argitaratua: (2016) -
Optimization of Fenton Oxidation to Treat Textile Wastewater/
nork: Siti Nurshamila Binti Zamzury
Argitaratua: (2016)