A case study on the improvement of production line at the automotive industry /
This project is on "a case study on the improvement of production line for side member at automotive industry". Traditionally operated industrial industries are facing problems like low productivity, longer production lead time, high rework and rejection, poor line balancing, low flexibili...
Sábháilte in:
Príomhchruthaitheoir: | |
---|---|
Formáid: | Tráchtas LEABHAR |
Teanga: | English |
Foilsithe / Cruthaithe: |
Perlis, Malaysia
School of Manufacturing Engineering, University Malaysia Perlis
2016
|
Ábhair: | |
Rochtain ar líne: | Click here to view the full text content |
Clibeanna: |
Cuir clib leis
Níl clibeanna ann, Bí ar an gcéad duine le clib a chur leis an taifead seo!
|
Achoimre: | This project is on "a case study on the improvement of production line for side member at automotive industry". Traditionally operated industrial industries are facing problems like low productivity, longer production lead time, high rework and rejection, poor line balancing, low flexibility of style changeover. These problems were addressed in this study by the implementation of Six SIGMA tools like standard manufacturing line, single piece flow, work standardization, just in time production. Some of the key benefits entail production cycle time decreased, number of operators required to produce equal amount of production is decreased, rework level reduced by, production lead time comes down to one hour from two days, work in progress inventory stays at a maximum of 400 pieces per shift. |
---|---|
Cur síos fisiciúil: | xi, 67 pages illustrations (some color) 30 cm. |