Application of program evaluation and review technique (PERT) and linear programming (LP) in project management /
This study seeks to control the management of a project and optimizing the cost by using Program Evaluation and Review Technique (PERT) and Linear Programming (LP). Data used is taken from a large-scale construction projects a new building consists of two floors which are Administration Office and M...
Tallennettuna:
| Päätekijä: | |
|---|---|
| Yhteisötekijä: | |
| Aineistotyyppi: | Opinnäyte Tietokoneohjelma E-kirja |
| Kieli: | English |
| Julkaistu: |
Perlis, Malaysia
Institute of Engineering Mathematics
2015
|
| Aiheet: | |
| Tagit: |
Lisää tagi
Ei tageja, Lisää ensimmäinen tagi!
|
| Yhteenveto: | This study seeks to control the management of a project and optimizing the cost by using Program Evaluation and Review Technique (PERT) and Linear Programming (LP). Data used is taken from a large-scale construction projects a new building consists of two floors which are Administration Office and Medan Selera for the new residential student's college project at the Main Campus of University Malaysia Perlis (UniMAP), Mukim Padang Siding, Pauh, Perlis. |
|---|---|
| Ulkoasu: | 1 CD-ROM 12 cm |
| Bibliografia: | Includes bibliographical references. |