Application of program evaluation and review technique (PERT) and linear programming (LP) in project management /
This study seeks to control the management of a project and optimizing the cost by using Program Evaluation and Review Technique (PERT) and Linear Programming (LP). Data used is taken from a large-scale construction projects a new building consists of two floors which are Administration Office and M...
Na minha lista:
| Autor principal: | |
|---|---|
| Autor Corporativo: | |
| Formato: | Tese Software livro eletrônico |
| Idioma: | English |
| Publicado em: |
Perlis, Malaysia
Institute of Engineering Mathematics
2015
|
| Assuntos: | |
| Tags: |
Adicionar Tag
Sem tags, seja o primeiro a adicionar uma tag!
|
| Resumo: | This study seeks to control the management of a project and optimizing the cost by using Program Evaluation and Review Technique (PERT) and Linear Programming (LP). Data used is taken from a large-scale construction projects a new building consists of two floors which are Administration Office and Medan Selera for the new residential student's college project at the Main Campus of University Malaysia Perlis (UniMAP), Mukim Padang Siding, Pauh, Perlis. |
|---|---|
| Descrição Física: | 1 CD-ROM 12 cm |
| Bibliografia: | Includes bibliographical references. |